EV Charging Stations
Level 2 home EV charger installation in Colorado Springs and the Pikes Peak region — dedicated 240V circuit, load calculation, and clean, code-compliant work.
A Level 2 charger turns overnight charging into a non-event. We install the dedicated 240V circuit, mount the charger where it actually works for your driveway or garage, and verify your panel can support it.
Every install starts with a load calculation. If your panel needs more capacity first, we will tell you before the work begins — no surprises.
We work with hardwired and plug-in chargers and can advise on placement, conduit runs, and whether a panel upgrade should come first.
We're a certified installer for Tesla, ChargePoint, and SPAN, so your charger and smart panel are installed to spec and keep their warranty coverage.
EV Charging Stations for the region.
EV adoption across the Front Range keeps climbing. A properly sized home charger on a dedicated circuit is faster, safer, and easier on your panel than relying on a standard outlet.
Where to go next.
Questions homeowners ask.
How long does an EV charger install take?
Most Level 2 installs take a few hours: dedicated 240V circuit, breaker, mounting, and testing. Panel distance and wall location drive most of the variation.
Do I need a panel upgrade for an EV charger?
Sometimes. A Level 2 charger is a significant load. We run a load calculation first; if your panel is near capacity, a 200A upgrade may be the right first step.
Can you install a charger I already bought?
Yes. We install most major hardwired and plug-in Level 2 chargers, and can advise on placement and circuit sizing.